35167369884_7ac1445912_o.jpg

GROUP 2

Capstone Project: Mary Mae Jones Elementary & Ruth Barker Middle School

Working together in your group, please explore this area on bike and on foot. Your group will collaborate to develop a concept(s) for a safe and comfortable active transportation connection(s) from this area to existing Bicycle and Pedestrian infrastructure. The goal is to increase bicycle and pedestrian connectivity to the schools from surrounding neighborhoods.

The connection should create access for as many students and households as possible.

You have an available budget of $1,250,000.

  • Average cost for Shared Use Paved Paths: $350 per linear foot.

  • Average cost of Protected Bike Lanes: $150 per linear foot.

  • Average cost of sidewalks: $125 per linear foot.

  • Average cost of Bicycle Boulevards/Shared Roadways: $100 per linear foot.

You will need to develop the routes/solutions via Google Earth or another mapping tool that will show the route and identify specific infrastructure elements, street/highway crossings, and potential obstacles.

You will present your concept(s) and justification to the full group as if you are presenting to a City Council or Commission and seeking approval to allocate funding for the project. Please develop a presentation in Powerpoint or other presentation app (Canva) that can be broadcast onto the screen in our meeting room. Please provide details on which facilities will be used (including placement of traffic calming efforts), why, and where they will be placed.

Factors to be addressed:

  1. Vehicle speed management

  2. Vehicle volume management

  3. Changes to parking

  4. Maximizing access to the most households

  5. Safety

  6. All ages and abilities

  7. Sensitivity to government spending and overreach

Schedule:

8:30am: Strategize as a group-Depart on bikes

10:30 am-12:30 pm11am: Develop presentations at The Ledger. Lunch will be available in the room at 12 pm.

1pm-1:30pm-Presentations begin